FEBEX II - Excavation Phase - Bentonite Excavation |
|
The second stage was to remove the bentonite blocks to allow removal
of the first heater. This task required careful work to avoid disturbing
the monitoring instrumentation installed within the Engineered
Barrier System (EBS).
A careful sampling program was also carried out to examine the
properties of the bentonite after 4 years of heating and hydration.

Exposure of the bentonite blocks behind
the concrete plug |
|

Close up of the bentonite blocks, note
the lack of gaps between the blocks |
| |
|
|

During the original emplacement of the
EBS, gaps could be seen between the. bentonite, these then sealed
up as the clay expanded due to hydration with groundwater (October
1996) |
|

Compare the original gaps (shown left)
to the situation found when excavating in June 2002 |
| |
|
|

Sampling of the bentonite was carried
out |
|

Cores of bentonite removed from the EBS |
|
|