 FEBEX - FEBEX II - Excavation Phase - Dismantling of Plug
 
 » FEBEX II Excavation Phase
 Dismantling of Concrete Plug
 Bentonite Excavation
 Heater Retrieval
 Shotcrete Plug
  < FEBEX Home Page
Home > FEBEX Project > Febex II - Excavation Phase
Full-scale High Level Waste Engineered Barriers (FEBEX)
FEBEX II - Excavation Phase - Dismantling of the Concrete Plug

The first stage of the excavation phase was the dismantling of the FEBEX concrete plug :

 

The first stage in the operation involved dismantling of the existing concrete plug (2.7 meters long - shown below) and exposure of the bentonite blocks that lay behind. Initially, a series of boreholes were drilled into the concrete plug:

The concrete plug prior to dismantling

Drilling boreholes into the concrete plug
   
The concrete plug was broken up by a hydraulic splitting techniques. As this continued, samples were also taken of the interface between the plug and the host rock

Hydraulic splitting of the concrete

Taking samples from the rock/plug interface
   
Eventually the bentonite was reached (shown left). The excavation of the bentonite is shown in the next section (FEBEX II - Excavation phase - Bentonite excavation).

 

 
Full-scale High Level Waste Engineered Barriers (FEBEX) Experiment  
 Phase VI Projects : CFM | LTD | T-H | NF-Pro | LCS | PSG | MTF
 Phase V Projects : CRR | EFP | FOM | FEBEX | GAM | GMT | HPF
© Copyright 2005 Grimsel Test Site - Switzerland