Grimsel Test Site (GTS)
Underground Research & Development URL
 
Home
Phase VI Experiments
CFM
LTD
T-H
NF-Pro
LCS
PSG
MTF
Phase V Experiments
CRR
EFP
FOM
FEBEX
GAM
GMT
HPF
 FEBEX - FEBEX I - In-Situ Testing - Emplacement
 
 » FEBEX I In-situ Testing
 FEBEX I Layout & Test Design
 Emplacement
 Heating and monitoring
  < FEBEX Home Page
Home > FEBEX Project > Febex I - In-situ Testing
Full-scale High Level Waste Engineered Barriers (FEBEX)
FEBEX I - In-Situ Testing - Emplacement of Heating Element

Emplacement of the Heater element into the Febex drift :

 

 
View toward the FEBEX tunnel during emplacement phase. In the foreground is the insertion car and in the background the backfilled tunnel is visible. The tunnel diameter is 2.28 m.   Loading of the electrical heater (weight 12 t, length 4.5 m) onto the insertion car.
     
  Heater insertion operation.

Note the numerous cables for the monitoring system on both sides and along the top line of the tunnel.

 

 
Full-scale High Level Waste Engineered Barriers (FEBEX) Experiment  
 Phase VI Projects : CFM | LTD | T-H | NF-Pro | LCS | PSG | MTF
 Phase V Projects : CRR | EFP | FOM | FEBEX | GAM | GMT | HPF
© Copyright 2005 Grimsel Test Site - Switzerland