 FEBEX - FEBEX II - Excavation Phase - Heater Retrieval
 
 » FEBEX II Excavation Phase
 Dismantling of Concrete Plug
 Bentonite Excavation
 Heater Retrieval
 Shotcrete Plug
  < FEBEX Home Page
Home > FEBEX Project > Febex II - Excavation Phase
Full-scale High Level Waste Engineered Barriers (FEBEX)
FEBEX II - Excavation Phase - Heater Retrieval

The third stage involved the removal of the heater from the Engineered Barrier System (EBS). This was a complicated task due to the size and weight of the heater (4.5 meters long and 12 tonnes in weight).

 


Preparatory work for removal of the heater
 
Removal of the heater from the bentonite
     

With the heater removed the steel liner keeps the EBS in place
 
View of the steel liner after retrieval of the heater
     

Close up of the steel liner after retrieval of the heater
   

 

 
Full-scale High Level Waste Engineered Barriers (FEBEX) Experiment  