Grimsel Test Site (GTS)
Underground Research & Development URL
 
Home
Phase VI Experiments
CFM
LTD
T-H
NF-Pro
LCS
PSG
MTF
Phase V Experiments
CRR
EFP
FOM
FEBEX
GAM
GMT
HPF
 FEBEX - FEBEX II Introduction
 
 FEBEX Project
FEBEX I
 FEBEX I Introduction
 In-situ Test »
 Mock-up Test
 Laboratory Studies
 Modelling
 FEBEX I Conclusions
FEBEX II
 FEBEX II Introduction
 Excavation Phase »
 Results to date
  < Home Page
Home > FEBEX Project
Full-scale High Level Waste Engineered Barriers (FEBEX)
FEBEX II - Introduction


Plug dismantling

FEBEX II carries on from the success of FEBEX I. Originally, it was planned to excavate both of the heating elements at the end of FEBEX I.

However, with 80% of the sensors still operational it was decided to continue with the heating phase of one heater and to remove the first heater.

The excavation of the EBS involved collection of over 1000 samples from various components of the EBS and provided invaluable data for the ongoing modelling programme.

FEBEX II Objectives

  • Improvement of the knowledge of the THM processes and validation of the numerical codes used.
  • Investigation of geo-chemical processes and validation of relevant numerical codes and databases.
  • Research on the potential changes in the key parameters of the buffer material.
  • Investigation of gas generation and transport processes.
  • Study of corrosion processes.
  • Study of the changes produced in the hydraulic regime of the rock mass with special emphasis on the excavation disturbed zone (EDZ).
  • Evaluation of the performance of the instruments and monitoring system.
  • Research and investigation of the technological aspects associated with canister retrieval

 

 
Full-scale High Level Waste Engineered Barriers (FEBEX) Experiment  
 Phase VI Projects : CFM | LTD | T-H | NF-Pro | LCS | PSG | MTF
 Phase V Projects : CRR | EFP | FOM | FEBEX | GAM | GMT | HPF
© Copyright 2005 Grimsel Test Site - Switzerland