Home
> FEBEX Project
|
Full-scale High Level Waste
Engineered Barriers (FEBEX)
FEBEX II - Introduction |
|
Plug dismantling
|
FEBEX II carries on from the success
of FEBEX I. Originally, it was planned
to excavate both of the heating elements at the end of FEBEX I.
However, with 80% of the sensors still operational it was decided
to continue with the heating phase of one heater and to remove the
first heater.
The excavation of the EBS involved collection of over 1000 samples
from various components of the EBS and provided invaluable data
for the ongoing modelling programme.
FEBEX II Objectives
- Improvement of the knowledge of the THM processes and validation
of the numerical codes used.
- Investigation of geo-chemical processes and validation of relevant
numerical codes and databases.
- Research on the potential changes in the key parameters of the
buffer material.
- Investigation of gas generation and transport processes.
- Study of corrosion processes.
- Study of the changes produced in the hydraulic regime of the
rock mass with special emphasis on the excavation disturbed zone
(EDZ).
- Evaluation of the performance of the instruments and monitoring
system.
- Research and investigation of the technological aspects associated
with canister retrieval
|