Full-scale High Level Waste
Engineered Barriers (FEBEX)
FEBEX I - Mock-up Test |
|
The "mock-up" test was conducted in the facilities of
CIEMAT (Madrid, Spain). The physical components of the test consist
of five basic units: the confining structure, with its hydration
system; the heating system; the clay barrier; the instrumentation;
and the systems for data acquisition and for heater control.
Predictive modelling has been carried out on THM and THG behaviour
during the pre-operational stage, along with modelling during the
operational stage and contrasting with the test monitoring values.
|

Mock up test - General
scheme
(Click on image to
view hi-res image)
|
|
Heater element specification.
| External diameter |
0.34 m |
| Length |
1.625 m |
| Material |
Carbon steel |
| Wall thickness |
0.04 m (interior of the core to exterior
of the sheet metal casing)/ 0.06m (end covers) |
| Working pressure |
9.0 MPa |
| Elements |
Sheet metal casing and end covers, 3 heating
elements and 9 temperature control points |
| Nominal maximum power |
2800 W |
| Total empty mass |
475 kg |
|
 |
|
|
|
|
Mock-up test - Heater
insertion preparation.
|
Mock-up test - Installed
instrumentation.
|

Measured and predicted relative
humidity in sections A3, B3, and Mock-up test.

Measured and predicted development
of stresses in sections A6, B6, Mock-up test.
|
|