| |
Home
> GMT Project
|
Gas Migration in EBS and
Geosphere (GMT)
Initial Conclusions |
|
The reporting phase of the Gas Migration Test is currently underway,
once completed, copies of the GMT reports can be obtained from Nagra
here.
Some initial conclusions can be drawn from the project:
- Visual inspection shows that buffer is unaltered from
construction
- Uniform bentonite content indicates no segregation after
emplacement.
- Mineralogical content was consistent with that emplaced.
- No dominant water flow direction was observed
- No lateral variability in density, porosity or water content
was seen in the geophysical logs.
- Directional logging did not show any high-porosity channels.
- Dry density typically increased indicating some small
additional compaction after emplacement.
- Concrete silo and vent showed no evidence of damage or
alteration.
|
|
|