 GMT - Excavation of the EBS - Investigations from top of Layer 12
 
 » Excavation of the EBS
 Overview
 Depressurisation of Cavern
 Cutting of Concrete Plug
 Removal of Backfill
 Investigations of Layer 12
 Removal of Sand/Bentonite
 Investigations of Layers 8 & 7
 Removal of Layers 6 & 5
 Restoration of GMT site
  < Back to GMT Page
Home > GMT Project > Excavation of the EBS
Gas Migration in EBS and Geosphere (GMT)
Excavation of the EBS - Investigations from top of Layer 12

The scientific excavation programme started with the removal of the gas collectors system on top of layer 12.

High resolution geophysical logging was used to identify and variation in buffer properties through the EBS and techniques for sampling the sand/bentonite mixture were tested.

 

 


The gas collection system on top of layer 12

Geophysical borehole logging in the sand/bentonite


Schematic of sampling and testing activities

 

 
Gas Migration in EBS and Geosphere (GMT) Experiment  
 Phase VI Projects : CFM | LTD | T-H | NF-Pro | LCS | PSG | MTF
 Phase V Projects : CRR | EFP | FOM | FEBEX | GAM | GMT | HPF
© Copyright 2005 Grimsel Test Site - Switzerland