Home
> GMT Project
> Excavation of the EBS
|
Gas Migration in EBS and
Geosphere (GMT)
Excavation of the EBS - Removal of sand/bentonite by layers
to top of
concrete silo |
|
The upper most layers of the sand bentonite were very carefully
excavated to minimise the potential disturbance of the silo, to
avoid damage of the instrumentation and to preserve any structural
alteration of the layers below which may have arisen from the water
and gas injection.

Excavation pattern for the GMT

Ingo Blechschmidt (Nagra) carefully removes
the sand/bentonite from layer 9
|