Near Field Processes
(NF-PRO)
Experimental Concept
The laboratory tests will be performed on two granite cores from
the GTS: (i) tests with a matrix core representing the intact granite
at the GTS and (ii) tests with a core which include a shear zone.
The planning of the experimental programme foresees the following
steps:
recovery of two cores
construction of the experimental set-up and detailed test plan
Beside controlled saturation and desaturation tests, a tracer test
to visualise the flow path will be carried out on the core which
includes a shear zone.
The laboratory experiment will feed into the ongoing FEBEX long-term
monitoring programme at the GTS by providing new calibration functions
for the granite probes. Post-processing of the entire TDR data base
will provide an updated TDR data set for the FEBEX master data base.
Time schedule
Start of the NF Pro in 2005
In-situ measurements (water content evolution of the EBS till
2007)