Grimsel Test Site (GTS)
Underground Research & Development URL
 
Home
Phase VI Experiments
CFM
LTD
T-H
NF-Pro
LCS
PSG
MTF
Phase V Experiments
CRR
EFP
FOM
FEBEX
GAM
GMT
HPF
 NF-PRO - Experimental Setup
 
 NF-PRO Project
 NF-PRO Introduction
 Motivation & Objectives
 Experimental Concept
 Experimental Setup
 Principles of TDR
 References
  < Home Page
Home > NF-PRO Project
Near Field Processes (NF-PRO)
Experimental Setup

The laboratory programme consists of long-term, controlled saturation/desaturation experiments with the two granite cores. The experimental setup allows continuous recording of the TDR reflectograms and changes in the weight of the granite cores.

The experiments will be carried out under controlled temperature and relative humidity conditions of the air around the cores. Two experiments run in parallel:

  1. long-term controlled saturation and desaturation test on the matrix core, and

  2. controlled saturation and desaturation test followed by a tracer test on the shear zone core.

Experimental Setup
Experimental Setup

 

 
Near Field Processes (NF-PRO) Experiment  
 Phase VI Projects : CFM | LTD | T-H | NF-Pro | LCS | PSG | MTF
 Phase V Projects : CRR | EFP | FOM | FEBEX | GAM | GMT | HPF
© Copyright 2005 Grimsel Test Site - Switzerland