The "mock-up" test was conducted in the facilities of CIEMAT (Madrid, Spain). The physical components of the test consist of five basic units: the confining structure, with its hydration system; the heating system; the clay barrier; the instrumentation; and the systems for data acquisition and for heater control.
Predictive modelling has been carried out on THM and THG behaviour during the pre-operational stage, along with modelling during the operational stage and contrasting with the test monitoring values.
Mock up test - General scheme
(Click on image to view hi-res image) |
Heater element specification.
|
![]() |
|
|
Mock-up test - Heater insertion preparation.
|
Mock-up test - Installed instrumentation.
|
Measured and predicted relative humidity in sections A3, B3, and Mock-up test.
Measured and predicted development of stresses in sections A6, B6, Mock-up test.
Full-scale High Level Waste Engineered Barriers (FEBEX)