The last step of the emplacement work done in the Gas-Permeable Seal Test (GAST) was the construction of the concrete bulkhead which is designed to withold the 50 bars water pressure generated by the water injected into the sand/bentonite plug.

Closing of experiment

Concrete mixing

Concrete injection

Concrete injection

Final plug
Gas-Permeable Seal Test (GAST)